Work on the pond has picked up so I haven't had much time to work on the sketchup proton pack, so luckily I was able to work on it a bit today. After alot of back and forth I finally finished the booster frame.
There was alot of back and forth on trying to figure out the placement of the ribs on the sides since the blue prints never specified, so thus again it was left to my interpretation.
I can gratefully say that Iam glad I got another part done, Iam at the home stretch pretty much all thats left is the wand and a couple little cosmetic things. Iam hoping Ill be able to finish it with in the next 2 months. Tune in soon for some pond updates, till next time.
No comments:
Post a Comment